We offer Grid Compliance Studies inline with various grid codes and relevant technical standards applicable to respective countries.
Power Collection Network (PCN) Study

Optimisation of PCN network to minimize the active power losses and reactive power requirement in collector network using load flow study.

Power Quality Study & Model

It includes study and assessment of harmonics, DC current and flicker assessment of the renewable energy plant at POI inline with CEA Regulations.

Steady State Analysis

It includes PSSE detailed and equivalent plant load flow model, plant active & reactive capability at Point of interconnection (POI) & report.

Dynamic State Analysis

Study & assessment of LVRT, HVRT, ramping capability, frequency control, frequency response etc. required compliance as per CEA regulations and working group report, PSSE plant detailed and equivalent model.

Electromagetic Transient Analysis

Study & assessment of LVRT, HVRT, ramping capability, frequency control etc. required compliance as per CEA regulations and working group report & equivalent plant model.


Review of IBR unit Certification Details

It includes review of various grid compliance certificate & test reports such as LVRT, HVRT, Power Quality, Grid Control, Reactive Power etc. in line with the CEA regulations.


Short Circuit Analysis

Assessment of short circuit current contribution of the IBR units and the Grid to validate the sizing of equipments.



Support in FTC Procedures

Verification and assessment of PPC testing results, examination and validation of DREL PCS records, and preparation and documentation of PPC test result reports.


Power Plant Controller (PPC)

It includes PPC testing inline with the procedures published by GRID-INDIA and according to IEGC 2023 regulations. We also offer technical support, validation of test reports of PPC.

As Built Model & Its Validation

After commissioning of the renewable project, as per CEA working committee report, within three months as-built models along with model validation report is required to be submitted to RLDC/SLDC.