Advisory on Processing of Application for Connection Details of Generators
Advisory on Processing of Application for Connection Details of Generators
This is in continuation to advisory issued by CTU on 20th November, 2025, regarding clarification on mismatch of installed capacity (IC) between simulation study models and connectivity grant letter, wherein it is mentioned that “In case of a mismatch in the IC value as per name plate rating of active power generating unit/equipment (IC greater than the that mentioned in connectivity grant letter) in the simulation study models, the grantee(s) are required to apply for enhancement in IC/addition of generation capacity under Regulation 5.2 of the CERC GNA Regulations, 2022
Join the conversation.
Likes are remembered in this browser. Names are self-declared and counts are approximate feedback.
Be the first to start a conversation. All comments are reviewed before publication.