Power system expertise. A world of possibilities. contact@gridinfy.com
← Important Documents/AdvisoriesImportant advisory

Advisory on Processing of Application for Connection Details of Generators

Advisory on Processing of Application for Connection Details of Generators

This is in continuation to advisory issued by CTU on 20th November, 2025, regarding clarification on mismatch of installed capacity (IC) between simulation study models and connectivity grant letter, wherein it is mentioned that “In case of a mismatch in the IC value as per name plate rating of active power generating unit/equipment (IC greater than the that mentioned in connectivity grant letter) in the simulation study models, the grantee(s) are required to apply for enhancement in IC/addition of generation capacity under Regulation 5.2 of the CERC GNA Regulations, 2022

LEARN. RESPOND. SHARE.

Join the conversation.

0 likes 0 comments

Just your name to leave a like. Your name stays private.

Leave a comment or share

Enter your name and email to comment or share. Only your name and approved comment appear publicly.

Be the first to start a conversation. All comments are reviewed before publication.

Likes are remembered in this browser. Names are self-declared and counts are approximate feedback.

GRIDiNFY / COMPANY BROCHURE

Get to know GRIDiNFY.

Explore our expertise, services and approach. Share a few details to receive our company brochure.

All four fields are required. No account or email OTP is needed.

GRIDiNFY · DOCUMENT ACCESS

Download your document.

  1. 1Details
  2. 2Email code
  3. 3Download
Your email stays private. Verification applies to this document and browser only.