CEA Manual on Transmission Planning 2026
Recently CEA has released manual on planning criteria 2026, this is relased in Oct'26. Previous CEA Manual on transmission planning was of 2023.
CEA has release planning criteria for transmission system planning in ISTS grid.
Recently CEA has released manual on planning criteria 2026, this is relased in Oct'26. Previous CEA Manual on transmission planning was of 2023.
Reports, publications and advisory documents.
Advisory on Processing of Application for Connection Details of Generators
Detailed Procedure for Grant of Connectivity & GNA notified under CERC (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022
Advisory on Processing of Connection Details Application w.r.t Renewable Plants/Parks
The Central Electricity Authority (Technical Standards for Connectivity to the Grid) Regulations set mandatory technical requirements for all users, generating stations, transmission utilities, and bulk consumers connecting to the Indian electricity grid
The Central Electricity Authority (Technical Standards for Connectivity to the Grid) Regulations set mandatory technical requirements for all users, generating stations, transmission utilities, and bulk consumers connecting to the Indian electricity grid.
The Central Electricity Authority (Technical Standards for Connectivity to the Grid) Regulations set mandatory technical requirements for all users, generating stations, transmission utilities, and bulk consumers connecting to the Indian electricity grid.
LIST OF STUDIES/TESTS TO BE CONDUCTED BY RE GENERATORS/PARKS IN PROCESS OF SUBMISSION OF FINAL TECHNICAL CONNECTION DATA FOR DEMONSTRATING COMPLIANCE WITH CEA TECHNICAL STANDARDS FOR CONNECTIVITY TO THE GRID
Procedure for assessment of the Design Temperature for RE Plants in compliance to CEA (Technical Standards for Connectivity to the Grid) Regulations
Report of the Working Group in respect of Data Submission Procedure and Verification of Compliance to CEA Regulations on Technical Standards for Connectivity to the Grid by RE Generators