Detailed Procedure for Grant of Connectivity & GNA notified under CERC (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022
Detailed Procedure for Grant of Connectivity & GNA notified under CERC (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022
This Detailed procedure may be called as the “Detailed Procedure to the CERC Connectivity and GNA Regulations, 2022”. This Detailed procedure shall come into force from the date of its notification by the Nodal Agency, i.e. Central Transmission Utility (CTU). The present Detailed Procedure is in supersession of the earlier Detailed Procedure to the CERC Connectivity and GNA Regulations notified by the CERC vide notification No. L-1/261/2021/CERC dated 14.10.2022.
LEARN. RESPOND. SHARE.
Join the conversation.
0 likes 0 comments
Likes are remembered in this browser. Names are self-declared and counts are approximate feedback.
Be the first to start a conversation. All comments are reviewed before publication.