Power system expertise. A world of possibilities. contact@gridinfy.com
← Important Documents/AdvisoriesImportant advisory

Detailed Procedure for Grant of Connectivity & GNA notified under CERC (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022

Detailed Procedure for Grant of Connectivity & GNA notified under CERC (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022

This Detailed procedure may be called as the “Detailed Procedure to the CERC Connectivity and GNA Regulations, 2022”. This Detailed procedure shall come into force from the date of its notification by the Nodal Agency, i.e. Central Transmission Utility (CTU). The present Detailed Procedure is in supersession of the earlier Detailed Procedure to the CERC Connectivity and GNA Regulations notified by the CERC vide notification No. L-1/261/2021/CERC dated 14.10.2022.

LEARN. RESPOND. SHARE.

Join the conversation.

0 likes 0 comments

Just your name to leave a like. Your name stays private.

Leave a comment or share

Enter your name and email to comment or share. Only your name and approved comment appear publicly.

Be the first to start a conversation. All comments are reviewed before publication.

Likes are remembered in this browser. Names are self-declared and counts are approximate feedback.

GRIDiNFY / COMPANY BROCHURE

Get to know GRIDiNFY.

Explore our expertise, services and approach. Share a few details to receive our company brochure.

All four fields are required. No account or email OTP is needed.

GRIDiNFY · DOCUMENT ACCESS

Download your document.

  1. 1Details
  2. 2Email code
  3. 3Download
Your email stays private. Verification applies to this document and browser only.